Skip to content
Home / Destinations / Angola
CNCA Central Africa 4 ports

Angola CNCA certificate

Every containerised shipment into Angola needs a valid Certificado Nacional de Carga, obtained before the container is loaded.

24–48 hrsTypical issuance
CNCACertificate
LuandaMain port
4Ports served

Is a CNCA mandatory for Angola?

Yes. A Certificado Nacional de Carga is required for containerised cargo destined for Angola. The reference must be obtained at the port of loading, before the cargo ships, and endorsed on the Bill of Lading. Without it, your shipment can be held, refused loading, or penalised on arrival.

New to this document? Read what a CNCA is and how it works.

Ports of discharge: Luanda, Lobito, Namibe, Cabinda.

ARCCLA or CNCA — which is it?

Both, and it causes confusion on nearly every first Angolan shipment.

CNCA stands for Conselho Nacional de Carregadores de Angola, the National Shippers’ Council. ARCCLA — Agência Reguladora de Certificação de Cargas e Logística de Angola — is the regulatory body that replaced it. ARCCLA is the current authority; CNCA is the older name that the shipping industry never stopped using.

They refer to the same certificate. If your customer asks for a CNCA and your carrier asks for an ARCCLA number, nobody is asking for anything different.

The requirement itself is one of the oldest in Africa, mandatory since 28 January 1994 under Presidential Decree Nr. 19/94. Every Bill of Lading must be accompanied by a Loading Certificate.

The original certificate has to travel

This is the single most important thing to know about Angola, and it catches out shippers who are experienced everywhere else.

Angola requires the importer to present the original hard copy of the certificate before cargo is released. Every other destination we cover accepts a digital copy or a reference number.

A PDF in your consignee’s inbox does not clear cargo in Luanda. The physical document has to reach them. Plan the courier leg alongside the shipping documents — not after the container has sailed, when you discover it is still sitting on someone’s desk.

A related quirk: unlike almost every other cargo tracking note, the Angolan certificate number does not need to appear on the Bill of Lading. That surprises people who are used to endorsing a reference on the B/L, but the physical certificate is what matters at the port.

The Documento Único, and why it comes first

Since 10 February 2015, a D.U. — Documento Único — has been required. It is the import licence, issued by the relevant Angolan ministry, and the importer obtains one for each shipment.

The order matters here. The D.U. must exist before the certificate application can be made. If your consignee has not obtained theirs, nothing can proceed at your end regardless of how complete your own paperwork is.

As with the DRC, the document that holds up an Angolan shipment usually belongs to the importer, not the shipper. Ask for the D.U. reference when you quote, not when you book.

It cannot be issued in Angola

The certificate must be applied for at origin. There is a prohibition on issuing it within Angola, so a shipment that sails uncovered cannot be regularised at the destination — which is why late applications are generally refused rather than penalised.

ARCCLA also allocates authorised agents by geographic territory. An agent authorised for one loading region cannot issue for another. If you load from more than one region, check that whoever you use is authorised for each.

Allow four days, not two

Angola is slower than most destinations on this list. A realistic cycle is around 96 hours from submission to a validated certificate: a draft for your approval quickly, then final validation by the Angolan authorities taking a further 24 to 48 hours.

Build that into your booking timeline. Angola is not a destination where a certificate can be arranged the day before loading.

Vehicles have their own rules

If you are shipping vehicles, there is a second requirement that has nothing to do with the certificate itself.

The importer must hold a vehicle authorisation letter from ANTT, the Agência Nacional dos Transportes Terrestres. Angola also enforces age limits: light vehicles must not exceed five years old, heavy vehicles eight years. This applies to both new and used vehicles.

An older vehicle will not become importable because the paperwork is correct. Check the age before the sale, not before the sailing.

Transit cargo

Cargo passing through Angola in transit to another country does not require a certificate. The requirement attaches to goods being imported into Angola, not to every container that touches an Angolan port.

What happens without one

Cargo is blocked at the port of discharge and the importer cannot clear it. Penalties are typically assessed at twice the certificate cost plus a regulatory charge set by the port authorities, and demurrage accrues while the cargo waits.

Because the certificate cannot be issued inside Angola, this is a harder position to recover from than in most destinations. Prevention is genuinely cheaper here.

Ports covered

Luanda handles the majority of Angolan container traffic. Lobito serves the Benguela corridor and increasingly the copper trade from the DRC and Zambia. Namibe and Cabinda cover the south and the northern oil enclave respectively.

Certain cargo types — food, plants and agricultural products — additionally require a phytosanitary certificate.

Requirements

Documents required for Angola

Draft Bill of Lading

The code is issued against it and endorsed on the final version.

Commercial invoice

Customs declaration and valuation.

Freight invoice

Transport cost record.

Export declaration

Confirms the goods are cleared for export at origin.

Process

How it works

Four stages. Two are yours, two are ours.

01 You

You send your documents

Day 0

Draft Bill of Lading, commercial invoice, freight invoice and export declaration, through the order form or by email.

02 HMG

We verify and file

Same day

Every document is checked against Angola requirements before submission, so it is not rejected on a detail.

03 You

You approve the draft

Your call

You see the draft certificate before any payment is due. Corrections at this stage cost nothing.

04 HMG

Certificate issued

24–48 hrs

You receive the validated certificate and reference number as a PDF, ready to endorse on the final Bill of Lading.

Questions

Angola CNCA FAQs

Who obtains the CNCA certificate?
The shipper, exporter or freight forwarder, at the port of loading, before the cargo is loaded. Not the importer at destination.
Which documents are required for CNCA to Angola?
Draft Bill of Lading, commercial invoice, freight invoice and export customs declaration.
What happens if cargo ships without one?
The container may be refused loading at origin, or held at the destination port until the declaration is regularised. Penalties are commonly a multiple of the certificate fee, and demurrage accrues daily.
Which ports does this cover in Angola?
Luanda, Lobito, Namibe, Cabinda.

Start your Angola order

Send your documents and we will return a validated certificate before loading.

Or message us on WhatsApp
1

Customer Details

2

Build Order

3

Review & Submit

Step 1: Your Information

Step 2: Build Your Order

Step 3: Review & Submit

Required Documents

Attention

Coverage

Other destinations

Requirements and deadlines for every country we cover.